Why?

Network maintenance is being performed while undergraduate classes are not in session.

Impact

Brief interruptions and periodic downtime are planned; Snaplogic will be unavailable.

Details

March 6th

5-7 AM Brief interruption of internet traffic to and from the WPI network is possible.

March 7th

5-7 AM 44 Portland Worcester Project Center and  Practice Point (50 Prescott) will experience downtime of approximately 20 minutes during upgrades.

8 AM - 5 PM Fuller Computer Room may experience very brief intermittent "hiccups" to network connectivity.

March 8th

4-5 AM  Network downtime during maintenance, including interruption of internet traffic to and from the WPI network. Intermittent disruptions are possible as work continues throughout the day. Buildings impacted:

Jeppson House - rescheduled - see below

Park Ave Garage, 29 Garden (Gateway) Garage - Gateway rescheduled - see below

Press Box

11, 16 Einhorn

2, 16 Elbridge - 16 Rescheduled - see below

26 Hackfeld

47 Institute

53 Wachusett - rescheduled - see below

157 West

111 Park Ave (First Friends)

Greek Houses: SAE2, ZP1, PKT1, AP1, PSS1, SPE2, TC1, AXP1, SP1, AXD1, PSK1, PSK2, SPE1, LXA1

8 AM - 5 PM Possible very brief "hiccup" in some network connections, but downtime is not expected. This may impact: 

Power House

37 Institute

Bartlett Center

Stoddard Apartments, Ellsworth Apartments, Fuller Apartments

26 Hackfield

25 Trowbridge

22 Schussler

Alden Hall, Goddard Hall, Kaven Hall, Olin Hall, Stratton Hall

Daniels Hall, Founders Hall, Institute Hall,  Morgan Hall, Riley Hall, 

Fuller Labs, Higgins Labs, Salsbury Labs, Washburn Labs

Gordon Library

Atwater Kent

Campus Center, Harrington Auditorium, Higgins House

Boynton Hall

Project Center

[evening] Wireless connectivity may be unavaible for up to 5 minutes.

6-7 PM Snaplogic will be unavailable during maintenance. Please disconnect prior to the start.

8-11:59 PM - Rescheduled from early morning for the locations below. Network downtime during maintenance, including interruption of internet traffic to and from the WPI network. Intermittent disruptions are possible as work continues throughout the day. Buildings impacted:

• 53 Wachusett

• 16 Elbridge

• 29G (Garden Garage) Gateway

• Jepson House

March 9th

 5-7 AM FLb27, AK Server Room and 60 Prescott Server Room may experience a brief network disruption.