Why?

Network switch upgrades are being performed on the selected buildings on August 16 - 17.

Impact

Users will experience a 15 minute disruption in their network connection while the upgraded switch reboots.

Benefits

Keeps the network up to date!

Details

The network switch upgrade will affect the following buildings:

  • 22 Schussler
  • 25 Trowbridge
  • 50 Prescott
  • Atwater Kent
  • Founders Hall
  • Fuller Labs
  • Sigma Pi