Workday feature release and maintenance, Linux maintenance, Windows updates, network switch replacement at 15 Sagamore, electrical work at Stratton Hall, server upgrade
Why?
Information Technology and vendors will be performing maintenance and updates throughout the month. New items will be continually added here as they are scheduled.
Linux Hosts Patch and Reboot, 9/26 5:00AM - 5:15AM
The Linux hosts listed above will be patched and rebooted on September 26 from 5:00am - 5:15am.
9/25/2023 6:00am
Electrical Work at Stratton Hall, 9/25 6:00AM - 8:00AM
On Monday, September 25 there will be a planned power shutdown from 6:00am - 8:00am at Stratton Hall and the Project Center. This is to allow the contractors complete electrical work for the Stratton Hall renovations. Users in the Project Center should shut down all electronic devices at the end of the business day on Friday, September 22.
9/25/2023 2:00am
Server Upgrade, 9/25 2:00AM - 2:30AM
There will be a server upgrade on September 25 and it may be briefly unavailable during the upgrade window.
9/19/2023 10:00pm
Windows Monthly Critical and Security Patches, 9/19 10:00PM - 9/20 5:00AM
These Linux hosts will be patched and may be briefly unavailable during reboot: math2022, math2018, tholian, workday-sftp.
9/16/2023 2:00am
Workday Monthly Maintenance, 9/16 2:00 - 9:00 AM
Workday will be unavailable for monthly maintenance on Saturday, September 16 from 2:00am ET to 9:00am ET.
9/13/2023 9:00pm
Network Switch Change at 15 Sagamore, 9/13 9:00 - 11:59PM
New network switches are being installed at 15 Sagamore. Network access at this location will be briefly unavailable during this window.
9/9/2023 2:00am
Workday Feature Release, 9/9 2:00 - 5:00 AM
Workday will be unavailable for its 2023 Release 2 on Saturday, September 9 from 2:00am ET to 5:00am ET.
9/8/2023 8:00am
Installation of New Fiber Optic Cable, 9/8 & 9/11 8:00AM - 5:00PM
New fiber optic cable is being installed between the Powerhouse and Fuller Labs. On 9/8, please avoid the manholes on the service roads between these buildings. On 9/11 the parking spots behind Boynton Hall will be blocked off to complete work on the Powerhouse.
9/5/2023 5:00am
Linux Server Patch and Reboot, 9/5 500 - 5:15AM
The Linux hosts listed above will be briefly unavailable on Tuesday, September 5 from 5:00am - 5:15am while they are patched and rebooted.